Kent Surrey & Sussex Air Ambulance Logo on Taylor Kings website – residential builders in Kent, Sussex & Surrey

TAYLOR KINGS x KSS CHARITY GOLF DAY 2026

TAYLOR KINGS x KSS CHARITY GOLF DAY 2026

On Thursday 16th July 2026, we welcomed more than 50 guests to Sweetwoods Golf Club for the first Taylor Kings Charity Golf Day, held in support of Air Ambulance Charity Kent Surrey Sussex (KSS).The event brought together colleagues, suppliers and friends from across the local construction and property industries for a day of golf, networking and fundraising in support of a charity which means a great deal to us personally.


With a beautiful day of weather upon us, a total of 45 players took part in the competition, with 18 local businesses generously sponsoring holes around the course. We were also fortunate to receive a fantastic selection of raffle prizes donated by several other local businesses, helping us to raise even more throughout the day!


Thanks to the generosity of everyone who played, sponsored, donated or supported the event, we are incredibly pleased to confirm that the day raised a total of £3049.00 for the charity.

£3,049.00 RAISED!

Every contribution will help KSS continue providing its lifesaving emergency medical service across Kent, Surrey and Sussex.
The charity operates 24 hours a day, 365 days a year, bringing specialist doctors, paramedics and hospital-level care directly to people experiencing the most serious medical emergencies.

With thanks to everyone who attended, sponsored & contributed – our donation raised enough money to fuel 8 lifesaving flights!

CONGRATULATIONS!

Congratulations to our first Charity Golf Day Competition Winners!

🏆 1ST PLACE: Rob Ranson of Offset Architects (£100 Amazon Voucher)

🏆 2ND PLACE: Alex Warwicka of Decorus (£50 Amazon Voucher)

🏆 3RD PLACE: James Stewart-Smith of Sleek Glazing (£25 Amazon Voucher)

🏆 CLOSEST TO PIN: Anton McLaughlin of Progressive Developers (Perrier Jouet Champagne)

THANK YOU!

A Huge Thank You To All Of Our 2026 Event Sponsors

We are extremely grateful to the following businesses for sponsoring holes at the Taylor Kings Charity Golf Day:

Our post-construction phase framework.

  • Deep Cleaning – We employ professional cleaners who understand the importance of the products they are using and the methods they adopt.
  • Completion inspections – We go over every inch of the project to ensure that the work meets our incredibly high expectations.
  • Submission of Certification – We submit all certification to the building inspector/s to achieve project completion.
  • Handover – We carry out a full walk-through with our clients so that they can be shown the operations of all new equipment.
  • Operations & Maintenance Manual – We assemble and present a full O&M folder with guides for any new systems and care instructions.
  • Documentation Pack – Alongside the O&M manual, we assemble a documentation pack for any work completed which includes as-built drawings, service mark-ups, specification packs and relevant certifications.
  • Contacts Directory – Beyond being the main point of contact, we also form a comprehensive list of contacts which have worked on the project.
  • 12 Month Rectification Visit – As standard on any project, we always return after 12 months to carry out any snagging.
  • Ongoing support – We are there for our existing clients, long after completion. From handyman tasks to full maintenance plans, we offer a level of service which is not offered to the wider public.

Our construction phase framework.

  • Internal Inspections – There are a host of inspections to be completed and recorded on a daily and weekly basis. From welfare facilities, tidiness and security to major safety considerations such as scaffolding – our site agents use a centralised mobile application, where we have created bespoke templates to follow and track all of the inspections.
  • External Inspection – We organise and fulfil compliance inspections from building and warranty inspectors and our third-party health and safety inspector.
  • Meetings – We hold official weekly site meetings for the project team and all parties which are affected the current or imminent programme. We also hold official progress meetings, normally on a monthly frequency, with the clients and wider project team.
  • Reviews – We constantly review and tweak all of the various pre-construction project plans and main programme, issuing any changes to the project team and client.
  • Quality Control – Anyone working on our sites knows the exceptional standards we expect, but we still remain vigilant and ensure that the standards are met in every detail.
  • Information Collation – we collate and present all building control inspections, product warranties, operating and maintenance records and start to form the post-completion documentation.

Our pre-construction framework.

  • Define the Project Scope – We sit down and evaluate the drawings, technical specifications and information schedules before setting out clear project objectives, deliverables, a breakdown of key components and a list of possible conflicts.
  • Set a Project Programme – using the agreed scope, we layout a project programme. We do this using GANTT chart software which is a tool to visualise and rationalize time scales.
  • Form a Cost Management plan – we use the costing documents and project programme to estimate financial forecasts.
  • Form a Risk Management plan – we seek to find, highlight and plan for any items which may create risk to the programme or budget.
  • Form a Health and Safety plan – this is an extension of our Construction Phase Plans and highlights our use of developed Risk and Method Statements.
  • Create a communication plan – how we inform any external parties like neighbours of work that may affect them, we look at setting on/off site meeting frequencies, expectations for the transfer of information in RFI’s (requests for information), completion of various Registers and form a centralised shared information hub.
  • Form a Procurement Plan – We assess the lead times of all proposed materials and trades and map these against the project programme to highlight any risks to the programme. 
  • Highlight Quality Concerns – we review the selected materials and specifications to assess any areas which will need careful quality control to meet our high expectations.

Our compliance commitments:

  • Qualified and competent personnel for every role, including Site Manager.
  • Safety Training Scheme (SMSTS) qualified site agents.
  • Dedicated Construction Phase Plans.
  • Fully developed Risk Assessments and Method Statements (RAMS).
  • Thorough Fire Control and Emergency Plans.
  • Detailed site inductions for all personnel and visitors.
  • Correct and clear site signage and first aid stations.
  • Regular inspections and maintenance of all plant and equipment by qualified third party inspectors (LOLER).
  • Daily inspections of plant and equipment.
  • Regular site inspection audits by a third party health & safety consultant.