The dome of Florence Cathedral was engineered and constructed by Filippo Brunelleschi between 1420 and 1436.
It stands as a masterwork of the Renaissance not just because of its innovative self-supporting brickwork double shell, but because of the custom-built lifting machines and Brunelleschi’s management of the construction process.
To this day, it is still the largest masonry dome in existence.
Brunelleschi had trained as a goldsmith rather than as an architect or engineer, and was widely mocked for his design and ambitious plans for the dome. However, he continued undeterred and did not simply design the dome and leave others to work out how it could be built.
He considered the structure, materials, construction sequence, access, lifting arrangements and costs as connected parts of the same problem. He even developed specialist machinery to move materials to working height and an amphibious vehicle to stop the marble from being damaged while it was being unloaded at the docks.
It took Brunelleschi two years of pre-construction planning before getting started in 1420.
So what is the point?
Successful builders and project managers have always understood that complicated construction cannot be left until you are on site and underway, with the missing details simply worked out as you go. Don’t be fooled into thinking that your residential project is ‘not that complicated’, because
it is.
There needs to be a central party asking whether the design can be constructed, whether it meets the client’s expectations, whether it remains within budget, whether the required information is available and whether the proposed sequence is safe and practical.
Without this oversight, a project can gradually become a collection of individual designs and decisions rather than one cohesive plan – something which should be avoided at all costs.
Our experience has been developed through physically building complicated residential projects, managing specialist trades and identifying and resolving, at an early stage, the realities that drawings do not always reveal. This construction-led approach to pre construction has become something we are incredibly proud of.
By becoming involved before construction begins, we can review a project through the eyes of the people who will eventually be responsible for delivering it. We can challenge buildability, identify missing information, contribute to design coordination, examine procurement risks and help ensure that the specification aligns with the budget and the client’s expectations.
No amount of preparation can remove every unknown. Construction takes place in the real world, where circumstances change and surprises occur, but what thorough pre-construction can do is remove as many unknowns as possible from the equation.
Do you have a centralised party looking after your residential project and guiding you through design, pre-construction, construction and completion?
If not, it’s probably worth considering who can.
Jeremy
Taylor Kings Ltd

We use cookies to improve your experience. You can accept, reject, or manage your preferences.
Our post-construction phase framework.
Our construction phase framework.
Our pre-construction framework.
Our compliance commitments: