Who Is Actually Managing Your Project?

A complex residential project will involve an architect, a structural engineer and a builder. In all likelihood there will be an interior designer, quantity surveyor and an AV specialist. Beyond that there may be an M&E consultant, lighting designer, landscape architect and numerous specialist suppliers.


That is a lot of very capable people. But who is actually managing the project? It sounds like an obvious question, yet the answer is often surprisingly unclear.


Everyone involved will have their own responsibilities, but that does not necessarily mean somebody is looking after the project as a whole.


Someone needs to understand how one decision affects another. Does the architectural detail work with the structure? Has the interior design been coordinated with the mechanical and electrical installation? Have the cost implications been considered? Is the information available early enough for procurement? Is the programme realistic?


Individually, these questions may sit with different members of the team. Collectively, this is project management, and it needs to start long before you go out to your preferred builders for pricing.
Without someone joining the dots, individual decisions can quickly start pulling the project in different directions. One consultant may be waiting for information from another. The contractor may be waiting for both. A specialist supplier may need a decision before something can be released into manufacture.


This often leaves the client having to make urgent decisions they reasonably assumed the professional team would resolve between themselves. This is not a criticism of the professionals involved, but the problem comes when everyone assumes somebody else is taking care of the gaps between them.


Good project management is not about producing endless spreadsheets or filling diaries with meetings (I’ve sat through far too many meetings that have gone nowhere). It is about understanding the complete picture, asking the right questions and making sure decisions are reached at the right time.


At Taylor Kings, this is increasingly how we prefer to work alongside our role as contractor.


Rather than arriving once the design is largely complete, we prefer to work with our clients from the outset. We can help organise the project, coordinate the professional team, review design decisions from a construction perspective, manage procurement and programme, and ultimately take the project through construction and completion.


The right architects, engineers and specialist designers are still essential, but in our opinion a well-organised project does not need numerous additional layers of management and separate points of contact.


For the right project, this allows us to offer our clients a genuine turnkey service. One team remains closely involved from the early conversations through to handing over the finished home. It can also reduce duplicated professional fees and, just as importantly, simplify communication.


A collection of excellent individual designs does not automatically create an excellent project. Someone still needs to stand far enough back to understand how everything fits together, while remaining close enough to deal with the detail.


So, if you are in the early stages of a substantial residential project and already have a talented team around you, there is still one important question worth asking…Who is actually managing it?

 

Jeremy

Taylor Kings Ltd

Our post-construction phase framework.

  • Deep Cleaning – We employ professional cleaners who understand the importance of the products they are using and the methods they adopt.
  • Completion inspections – We go over every inch of the project to ensure that the work meets our incredibly high expectations.
  • Submission of Certification – We submit all certification to the building inspector/s to achieve project completion.
  • Handover – We carry out a full walk-through with our clients so that they can be shown the operations of all new equipment.
  • Operations & Maintenance Manual – We assemble and present a full O&M folder with guides for any new systems and care instructions.
  • Documentation Pack – Alongside the O&M manual, we assemble a documentation pack for any work completed which includes as-built drawings, service mark-ups, specification packs and relevant certifications.
  • Contacts Directory – Beyond being the main point of contact, we also form a comprehensive list of contacts which have worked on the project.
  • 12 Month Rectification Visit – As standard on any project, we always return after 12 months to carry out any snagging.
  • Ongoing support – We are there for our existing clients, long after completion. From handyman tasks to full maintenance plans, we offer a level of service which is not offered to the wider public.

Our construction phase framework.

  • Internal Inspections – There are a host of inspections to be completed and recorded on a daily and weekly basis. From welfare facilities, tidiness and security to major safety considerations such as scaffolding – our site agents use a centralised mobile application, where we have created bespoke templates to follow and track all of the inspections.
  • External Inspection – We organise and fulfil compliance inspections from building and warranty inspectors and our third-party health and safety inspector.
  • Meetings – We hold official weekly site meetings for the project team and all parties which are affected the current or imminent programme. We also hold official progress meetings, normally on a monthly frequency, with the clients and wider project team.
  • Reviews – We constantly review and tweak all of the various pre-construction project plans and main programme, issuing any changes to the project team and client.
  • Quality Control – Anyone working on our sites knows the exceptional standards we expect, but we still remain vigilant and ensure that the standards are met in every detail.
  • Information Collation – we collate and present all building control inspections, product warranties, operating and maintenance records and start to form the post-completion documentation.

Our pre-construction framework.

  • Define the Project Scope – We sit down and evaluate the drawings, technical specifications and information schedules before setting out clear project objectives, deliverables, a breakdown of key components and a list of possible conflicts.
  • Set a Project Programme – using the agreed scope, we layout a project programme. We do this using GANTT chart software which is a tool to visualise and rationalize time scales.
  • Form a Cost Management plan – we use the costing documents and project programme to estimate financial forecasts.
  • Form a Risk Management plan – we seek to find, highlight and plan for any items which may create risk to the programme or budget.
  • Form a Health and Safety plan – this is an extension of our Construction Phase Plans and highlights our use of developed Risk and Method Statements.
  • Create a communication plan – how we inform any external parties like neighbours of work that may affect them, we look at setting on/off site meeting frequencies, expectations for the transfer of information in RFI’s (requests for information), completion of various Registers and form a centralised shared information hub.
  • Form a Procurement Plan – We assess the lead times of all proposed materials and trades and map these against the project programme to highlight any risks to the programme. 
  • Highlight Quality Concerns – we review the selected materials and specifications to assess any areas which will need careful quality control to meet our high expectations.

Our compliance commitments:

  • Qualified and competent personnel for every role, including Site Manager.
  • Safety Training Scheme (SMSTS) qualified site agents.
  • Dedicated Construction Phase Plans.
  • Fully developed Risk Assessments and Method Statements (RAMS).
  • Thorough Fire Control and Emergency Plans.
  • Detailed site inductions for all personnel and visitors.
  • Correct and clear site signage and first aid stations.
  • Regular inspections and maintenance of all plant and equipment by qualified third party inspectors (LOLER).
  • Daily inspections of plant and equipment.
  • Regular site inspection audits by a third party health & safety consultant.